POSTEAK FURNITURE INDONESIA

Costing Dashboard

Overview of product cost and pricing

Total SKU0Imported from Excel
Avg. Production CostRp0per SKU
Avg. Wood CostRp0per SKU
Monthly Overhead PoolRp0master

Product Costing

Search and filter SKU by buyer or collection

Template
SKUGradeWoodTotal CostPrice 20%FOB PriceTags

Cushion Costing

Search and filter cushion SKU by buyer or collection

SKUSeat CostBack CostPillow CostTotal CostSelling PriceFOB USDTags
Loading cushion costing…

Cost Mix

Average across loaded SKUs

SKU Costing Workspace
01

Wood Costing

Rp0
Raw Wood = Finished Volume ÷ (Yield % ÷ 100) • Wood Cost = Raw Wood × Wood Price / m³
02

Kiln Dry

Rp0
Kiln Dry = Raw Wood Volume × KD Cost / m³
03

Assembling

Rp0
Assembling = Rate / SKU × Qty
04

Aluminum

Rp0
Linked Production CostRp0Select an Aluminum Costing SKU
Simple: Aluminum Cost = Usage Qty × Rate / Unit. Linked: cost is pulled automatically from the selected Aluminum Costing SKU.
05

Coating

Rp0
Coating Cost = Usage Qty × Rate / Unit.
06

Batyline

Rp0
Batyline Cost = (Usage meter × Price / meter) + Labor Cost by Furniture Type.
07

Rope

Rp0
Rope Cost = (Usage meter × Price / meter) + Labor Cost by Furniture Type.
08

Hardware

Rp0
Hardware cost per SKU.
09

Finishing

Rp0
Liters = Area ÷ Coverage × Coats • Total = Material + Finishing Labor + Sanding
10

Overhead

Rp0
Overhead = Allocation Basis × Master Rate
11

Box Packaging

Rp0
Packing = (Box + Foam + Protection Materials) ÷ Pcs/Carton + Labor. Additional packaging materials can be added from Wood Master.
12

Container

Rp0
Container = Packed CBM × Container Rate / CBM
13

FOB

Rp0
FOB = Packed CBM × FOB Rate / CBM

Wood Component Calculator

Component-level timber costing from Excel logic

ComponentL cmW cmT cmQtyFinished m³Raw m³Surface m²Cost
Total000Rp0
Aluminum Costing Workspace
Component-based aluminum frame costing from profile weight, process cost and finishing

Aluminum Components

Build the aluminum frame BOM from profile, length, quantity, and profile weight.

Surface Area0.000 m²
Total Weight0.00 kg
01

Fabrication

Rp0
Fabrication = Cutting + Welding + Machining + Grinding
02

Powder Coating

Rp0
Coating = Frame Weight × Rate/kg, or Surface Area × Rate/m²
03

Assembly

Rp0
Assembly Cost = Assembly Hours × Assembly Rate / Hour
04

Hardware

Rp0
Hardware Cost = Hardware + Other Material
05

Packaging

Rp0
06

Overhead

Rp0
07

Container & FOB

Rp0
Logistics = Packed CBM × (Container Rate + FOB Rate)
Cushion Costing Workspace
Separate cushion cost based on foam, fabric, Batyline and sewing inputs
Cushion PartsClick a row to edit the component detail
Container Load & Packing List
Plan container loading and generate a packing list from SKU costing data

Load Items

Dimensions pull from SKU packed dimensions when available and remain editable.

Auto saved

3D Load Preview

Automatic collision-checked packing using the v2.8.5 container engine.

Add SKU items to start automatic packing.
Packing updates automatically as load inputs change.

SKU Load Summary

Effective container allocation reflects unused space in the simulated load.

SKURequestedLoadedUnloadedOccupied CBMEffective Cost / Unit

Aluminum Profile Master

Add, edit or remove aluminum profile types, dimensions in mm, alloy, weight per meter and purchase price.

Auto saved

Process Rate Master

Fabrication, coating and assembly rates. Shared costs are copied automatically from Wood Master.

Coating Master

Add, edit or remove aluminum coating types, units and cost per unit.

Auto saved

Furniture Type Fabrication Averages

Average cutting, welding, machining, grinding and assembly time per SKU. Select a Furniture Type in Aluminum Costing to pull these defaults automatically.

Auto saved

Foam Master

Block price and dimensions automatically calculate foam price per m³.

Outer Fabric Master

Fabric price per m² and waste allowance.

Other Cushion Inputs

Labor, waste, inner fabric and Batyline rates from Cushion Master.

Wood Master

Add, edit or remove teak grades and furniture yield types.

Auto saved

Kiln Dry Master

Edit batch inputs and KD rate.

Auto saved

Assembling Master

Add, edit or remove furniture types and assembly rates.

Auto saved

Batyline Master

Manage Batyline price per meter and usage by Furniture Type.

Auto saved

Rope Master

Add rope variants, unit and cost per unit.

Auto saved

Finishing Master

Add finishing materials and edit coverage, labor and sanding rates.

Auto saved

Overhead Master

Edit allocation rates and monthly overhead.

Auto saved

Packaging Master

Add packaging types and edit carton, foam, labor and protection rates.

Auto saved

Hardware Master

Edit default hardware cost per SKU.

Auto saved

Container Master

Edit container allocation rate per CBM.

Auto saved

FOB Master

Edit FOB allocation rate per CBM.

Auto saved